Answer Posted / naresh thakur
1:1:2
| Is This Answer Correct ? | 35 Yes | 2 No |
Post New Answer View All Answers
What is proportion of PCC Grade G?
What is the outturn of Ceiling plastering
Define What is the meaning of a blue land surveyors flag?
How to calculate the crank rod in slab
Pls provide me with the calculation or codes related to de- shuttering of flat slabs
what is the difference b/w full length and cutting length?
How do you calculate the power of a centrifugal pump?
Labor requirement for each item needed? Lean Concrete 103.550m3 Concrete for Foundation and Structure 1753.000m3 Expansion joint 288.000m Contraction joint 127.000m Dowel bar 450.000m
1) write Short notes about Shellow & Deep well? 2) What is the full form of SPT & SMB? write short notes. 3) write short notes about efficiency of Riveted joint.
In how many types u can do POP on ceiling and walls(on which material or by using which material)? b) what is the difference between dry , oil bound, enamel, acrlyic type of painting?
Use of coping on terrace wall and in 4" wall is compulsory or not ?
Howmuch bend to be provide for 200/600 BEEM
Permissible wastage of cement as per IS code ? In which IS code I get it?
) Design a gussetted base for a column section consisting of one sc 250 with two cover plates 300 x 25 mm carrying an axial load of 2500 KN. The S.B.C. of soil is 250 KN/m2 and the permissible bearing pressure on concrete is 4000 KN.
50 acre of land to be reclaimed for an average height of 2.5 mt. Dredging area is 500mx200m size. what is the dredging depth required to reclaim the area?