Answer Posted / balasubramanian
MIS or Management Information System is a computer based
system used by most organizations worldwide for transforming
data into useful information for better decision making. It
helps management make better plans and carefully organize
business operations.
Management information system is used for generating reports
including inventory status reports financial statements
performance reports etc. These reports are essential for
analyzing different aspects of business. These reports also
help to answer 'what-if' questions like what would be the
effect on cash flows of a company if the credit term is
changed for its customers etc.
MIS reports also support decision making and it helps to
integrate the decision maker and the quantitative model
being used. These automated systems allow managers to make
decisions for smooth & successful operation of businesses.
The systems includes computer resources people and
procedures used in the modern business enterprise
Is This Answer Correct ? | 36 Yes | 0 No |
Post New Answer View All Answers
What is the basic difference between OPC
What happens when,in Prestressed girder the HDPE duct and cone size is provided more than required? (technical answer expected)
What are the points to be considered for calculating cement reconciliation. a)Do we need to deduct the wt of cement bags b)Do we need to adjust the qty due to wt loss during transportation, loading unloading etc or else each bag can be considered as 50 kg bag c)What is the proportion of mix cover block making.
How to calculate the quantity of cement mortar 2" for mosaic tile fixing 12"x12"?
What is progress payment?
how beam.coloum ,slab, footing are designed as per indian code.. detail procedure?
how to remove the quantity of metal 1 and metal 2 in concrete
What is the strength of 1:6:12 mix?
what is labour consume factor in residential projects
What is Grid floor and mention its advantages ?
What is .Dwg?
20 mpa what is the quantity of cement sand and aggregate in one cubic meter of pcc non rainforcement concreate kindly answer including formaula thanks
what is pile and deam foundation
what is difference between GTS bench mark and temporary bench mark
Concrete cover for slab, column, beam and footing?