What is ERW & shedule & seamless pipe? and whas the IBR
grade pipe.

Answer Posted / arvind raghu

1) ERW pipe:- Electrical Resistance welded tube,flat skelp
is to be converted gradually in to circular form and weld
through high frequency welder ,weld seam is appear in the
form of offset ,which is removed thro o.d. sgarfing tool.

2)shedule pipe:-it is aindicative of pipe thickness.

3) Seamless:-It is solid pipe without seam welding. it
extruded.

4) IBR pipe :- Meterial composition and pipe test are as
per IBR regulation approval,must have the IBR approved
cirtificate

Is This Answer Correct ?    61 Yes 9 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

Can anybody please tell me from where I can get sample placement papers so that ii can prepare accordingly.

1169


1.how to Ask the result After the interview gone? 2.please send me the interview questions of unigraphics,IDEAS,solidworks,autocadd,and mechanical design. to my mail id austinsobanam@gmail.com

11639


How does a boat measure speed?

672


What is the difference between Over Molding and insert molding ?

4812


what is meant by absorptivity?

641






Explain why will an ice cube placed in a cup of hot rotating water spin automatically faster than the water itself?

555


I am a mechanical student.And have cleared the written for NTPC. Please suggest what and how to prepare for the interview.i have got only 2-3 weeks in hand.

1507


Do you have idea about various methods of production of gears ?

639


purpose of primary and secondary air? causes of smoke?

1774


Dear all, Will some one help me in this issue please? We are entering the Zero Stock Component in Maintenance Order, and we make a Check when the order creator is going to release system will appear Error, until he will not delete that zero stock components from the Maintenance order. but right now what the order creator is not releasing the order but he is going to save order, when's he save the order without release system will generate Reservation in the back ground, which should not happen for Zero Stock Components ? I need the way which we are doing in MB21, Reservation creation by thru Cost Center / WBS Element. At present if you run MB21 and you are going to issue the material system will not allow to generate the reservation if there are zero stock components in the list. please guide me for this issue ? Note : Simple what I need is I don't want to create any reservation thru maintenance order for the Zero Stock Components. Regards, Abdul Mujeeb

1385


What is the indication of leaking starting valve of an engine?

1674


) Shall be responsible for the inspection/ maintenance of all the yard Assets as per the Maintenance procedure and maintain/update the related records correctly

1149


Can some one please show me the design of a POT Bearing.

2172


please send me rrb question papers of SE MECHANICAL

1738


what is the required force to bend 2.5 MS sheet in 90 degrees and what is the formula to calculate the same?

2244