how we can calculate the transformer size.
Answer Posted / v v s reddy
Check the following conitions
1. Rating of transformer is sufficient to totao load
2. Thermal loading on the transformer during motor starting
3.Voltage available at motor terminal during motor starting
4.Voltage available at bus during motor starting
| Is This Answer Correct ? | 7 Yes | 16 No |
Post New Answer View All Answers
How to Prepare preventive maintenance shedule of machine tool.
why genarator genarating voltage 11 KV?
PLZ sent the previous year question paper for GET in NHPC on my EMail id ppshanker@gmail.com
is it possible to say motor horsepower number without seeing name plate(when name plate damaged)
Define cut-off rate?
A double circuit with dog conductor 66KV Transmission line from wind farm evacuation to feeding substation having capacity of 25MW for transmission. Can same transmission network be considered for further expansion of Power & how much in MW. If we need to expand next 10-15 MW more will there any augmentation is required in transmission network? Kindly reply asap.
What is meant by coupling capacitor?
How a band pass filter is constructed?
what is the difference between droop mode and ischnorous mode in thermal powerplant?
what is 3rd Harmonics? how it is generated in alternator
exolain the star delta connection
explain with diagram how to protect transformers and substations from over current with help of CT's?
what is transient enclosure vltage , very fast transients, very fast transient over voltages
What do you mean by a phase angel of instrument transformer?
how can you size an automatic voltage regulator?