What is In (current rating) shown on the MCCB? Is this full
load which can withstand by the circuit breaker
Answer Posted / devesh mishra
ln=200A means the full/maximum load current(200A) beyond which the MCCB trips due to overload.
9KA stands for the breaking capacity.
Is This Answer Correct ? | 7 Yes | 3 No |
Post New Answer View All Answers
What is T’Q and X’Q and X’D ? and what is saturated as well as unsaturated ?
What is the use of iron core in a transformer?
Earth has zero potential then what would be the neutral potential ?
I am getting above 60 V as open delta voltage against single phase unit ICT at tertiary delta formed and ICT getting trippped on NDR. ICT tested and found in order. PTs provided on tertiary are tested and in order. what may be the reason?
Working of microwave oven?
I am having a 42KW 3 phase electrical heating furnace, heating element is 80/20 nichrome material, my connections is made in such a way that 2 star connection compromising 2 coils per phase so totally 12 coils, shall if i use it unbalanced star condition (instead of 2 group of 3 phase or 1 group of 3 phase, connecting 4 phases of 5 phases) what will be the consequences and is it acceptable?
For a three phase induction motor, what will be the effect on motor if the neutral of the system is shifted to say 20 deg.?
when we have to use UPF wattmeter and LPF wattmeter? what is the difference between UPF and LPF wattmeter in terms of construction?
what is the easiest method of short circuit current calculation ? pls. derive with a mathematical example in real life application.
why dc is used in control circuits for MV & LV switchgeras instead of ac
what is the path of thunderlightening? once both a buffalo and a person were standing 5m apart but lightening hit and killed buffalo not person?
We normally make oil soak pits under Transformers. Oil from soak pit goes to collection pit. We provide granules/pebbles under transformers. My question is weather granules/ pebbles to be filled in soak pit or not? if yes upto what level?
# 4 hi friends i m from electrical branch and seeking for tech. + apti. both papers of hpcl plz get it available as soon as possible my email id is sumit_lig189@yahoo.co.in
DESCRIBE THE CONSTRUCTION ANDOPERATION OF BELT CONVEYORS AND SCR CONVEYORS , DRAW NEAT SKETCHES
On 400 amp factory load how kvarh capacitors provide