How to connect frequency meter in metering circuit?(single
phase and three phase frequency meter)
Answer Posted / kumar
in peral of supply
Is This Answer Correct ? | 5 Yes | 0 No |
Post New Answer View All Answers
Hi,I am working in abroad for more than 3 years in a company operating with 11kv and 6.4 MW power. I need c licence in India,can I? some other says only i can get if i work for 2 years in india only! anybody kindly clarify by doubt.Thanks
What is Servo Ventilated Motor?
we have consol make 3 phase servo stabilizer for cnc m/c. while installing the earth neutral voltage is 1.7 volts at stbilizer off condition and when stabilizer get on en voltage reaches 4.8 volts (new earthing is done and neutral is helthy condition all phase to neutral volts 440,442,441 v)why this happen.solution for cause.
Tell me the reason of connecting domestic t/f primary in star or delta,and also secondary side.
What is the use for cable entry in control room?
State angle criterion.
operation of diesel generator
What is the dc grounding system and what is diff between AC/DC grounding system?
If we use 250A MCCB as a incomer in Control panel for a fault level of 50kA for one second ,assuming temperature rise from 85 Deg. to 100 Deg , Then what will be the Aluminium Bus-bar size for 250A MCCB? Explain in detail.
Why hydropower is called renewable source of energy?
What is the formula for calculating no-load current?
What is resolver and glass scale in CNC how they work?
how to determine ct ratio in ht vcb?
(1)The demand for electricity , the amount of renewable generation available, the amount of fossil fuel generation available and the cost of the fossil fuel generation are shown in table below period(hrs) demand(MW) renewable (MW) fossil- fuel(MW) cost of fossil fuel(MW) 00.00 - 01.00 2000 1800 2000 30 01.00 - 02.00 2300 2500 2000 30 02.00 - 03.00 2500 2700 2100 45 03.00 - 04.00 2900 3100 2100 50 04.00 - 05.00 2700 2600 2500 45 05.00 - 06.00 2400 2000 2700 50 06.00 - 07.00 2200 1800 2000 36 07.00 - 08.00 2100 1600 2000 36 Assuming that the renewable generation incurs zero cost, determine an optimal generation schedule(specifying the amount of renewable generation and fossil fuel generation used in each period, the cost for each period and the overall cost for 8 hours.)
Is a 300w induction motor used in a food processor as powerful as a 1000w DC motor.