How many earthing pits required for diesel generator set ? Why ?

Answer Posted / venkatesh

For a single DG set, 4 earthpits will be required - 2 for
body & 2 for neutral.Suppose you have 3 DG sets then 12
earthpits will be required - 6 for body earthing of all
three DGs (2 for each DG) & 6 for neutral (2 for each DG).
The two earthpits for body shall be in grid. The two
earthpits for neutral of a DG shall also be in grid, but
earthpits for neutral of different DGs shall not be in grid.

Is This Answer Correct ?    24 Yes 13 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

Which parameter remains constant in a throttling process ?

670


Heavy fuel oil sulfur content and counter measures?

1414


What is the cause of pressure drop in a centrifugal

1575


What is a brake horsepower?

1610


what is the exact heat treatment cycle of IS 4522 Gr6 to get the required properties?

2014






Explain why do the radiators in your house click when you start the heating system?

662


Draw the flow of F.O. diagram from service tank to Main Engine?

2391


Does the rate increase by experience or number of years worked?

592


interviw tips for bhel supervisor trainee

2305


What is diffrence between star & delta connnection in practical situation in submersible pump?

1512


en 19 & en24 which one is good for pipe mill shaft

1184


what is the difference between cold and hot spark plug? mention their place of use with justification?

2664


Dear all, Will some one help me in this issue please? We are entering the Zero Stock Component in Maintenance Order, and we make a Check when the order creator is going to release system will appear Error, until he will not delete that zero stock components from the Maintenance order. but right now what the order creator is not releasing the order but he is going to save order, when's he save the order without release system will generate Reservation in the back ground, which should not happen for Zero Stock Components ? I need the way which we are doing in MB21, Reservation creation by thru Cost Center / WBS Element. At present if you run MB21 and you are going to issue the material system will not allow to generate the reservation if there are zero stock components in the list. please guide me for this issue ? Note : Simple what I need is I don't want to create any reservation thru maintenance order for the Zero Stock Components. Regards, Abdul Mujeeb

1385


How fast is a jet plane?

640


If anybody have the ref. design book of the 3 point cylindrical rolling with sheet thickness of 2.3 mm & 67 mm internal diameter legth of 80 mm

1346