please what is the number of bars required for a column of 6mx6m and 450mmx300mm,its a commercial building (Church)
how much shouid be the rate for ready mix concrete per cubic meter
what do you know that m20,m25
what is the theoritical percentage of concrete cubes testing per day?
What is the meaning of Brick- M 35 grade? Is it a common brick or it's a concrete brick?
Under what circumstances should pot bearings be used instead of elastomeric bearings?
why we are using stub column..? is it possible to construct steel stub column..?
If a slab concrete is placed with M-20 grade concrete, actually it has to be placed with M-30. what are the rectifications / measures to be taken after concreting is done.
How much of fly ash is allowable in Portland cement and what is the disadvantage when the level of fly ash is increased?
Whats be the minimum foundation depth of multistoried building as per height of building in individual footing?
How to plan a project
Rate analysis of 150mm, 100mm, & 230mm thk BBM work
how to calculate cut length of re-bar in a circle . because we not place same length of re-bar in whole circle maximum in center and minimum at corner so how to calculate middle bars???
What are the different softwares used for cad?
how many sqft or cft of work done by a mason per day in all works such as brick,block,concrete,shuttering carpenter,reinforcement fabricator,painter,door window carpenter.....everything thank you