In EHV tranm. The conductors are ……..
a) Cu roads b) Cu bars with Si c) Cu tube with
Si plate
Answer Posted / khilendra pant
c) Cu tube with
Si plate
Is This Answer Correct ? | 1 Yes | 1 No |
Post New Answer View All Answers
Tell me about ur past electrical maintanence job
How to calculate the volumetric capacity of a oxygen & Nitrogen gas Cylinder if pressure is 145 kg/cm2 & water capacity of cylinder is 67 liters.
what happen if the supply is given to the stator of the 3phase induction motor with out assembling the rotor ?
hii this is ranjith from hyd... i want to know what type of questions they ask in interview...and hw the interview will go..? what subjects thay ask specially for electrical engg students?
acb(AIR CIRCUIT BREAKER)NOT CHARGING AUTO
For electrical designers what are the standard should know? i want learn about this standards. how to get information/reference. anybody help in this regards please.
what is lumped and distributed elements?
why swinburnes test cannot be performed on series machines?explain
how to design step down 12 V, 1mA small transformer from 220 V AC? Because according to VI relation and power transfer it results bulky...
What is 11 N1 and 12 N2 in single phase Transformer ?
(1)The demand for electricity , the amount of renewable generation available, the amount of fossil fuel generation available and the cost of the fossil fuel generation are shown in table below period(hrs) demand(MW) renewable (MW) fossil- fuel(MW) cost of fossil fuel(MW) 00.00 - 01.00 2000 1800 2000 30 01.00 - 02.00 2300 2500 2000 30 02.00 - 03.00 2500 2700 2100 45 03.00 - 04.00 2900 3100 2100 50 04.00 - 05.00 2700 2600 2500 45 05.00 - 06.00 2400 2000 2700 50 06.00 - 07.00 2200 1800 2000 36 07.00 - 08.00 2100 1600 2000 36 Assuming that the renewable generation incurs zero cost, determine an optimal generation schedule(specifying the amount of renewable generation and fossil fuel generation used in each period, the cost for each period and the overall cost for 8 hours.)
why we used ZNO in Lightning arrester.
Is it posible to instal one more SMDB from the existing SMDB and is it practical.
HOW WE CALCULATE CURRENT IF THERE ARE NOT PRESENT ANY AMMETER OR MULTIMMETER??????
what is difference between 5A and 100A CT constructional wise and operation?