whats the one main difference between UPS & inverter ?
And electrical engineering & electronics engineering ?
Answer Posted / kunal
uninterrupt power supply is mainly use for short time .
means according to ups VA it gives backup.
ups is also two types : on line and offline . online ups
having high volt and amp for long time backup with with
high dc voltage.but ups start with 12v dc with 7 amp.
but inverter is startwith 12v,24,dc to 36v dc and 120amp to
180amp battery with long time backup.
Is This Answer Correct ? | 11 Yes | 8 No |
Post New Answer View All Answers
What is the criteria that generally follow by distribution licenses to fix contact demand of their industrial customers?
3 shows a 415 V, 3-phase generator supplying a 3-phase 415/110 V transformer. Draw the individual and combined impedance diagrams to a base of 10 kVA. Determine the system fault kVA and the fault currents at the 415 V and 110 V busbars for short circuit faults on the transformer input or output terminals. Work in p.u. values of impedances.
This is reqd for a 1MW Solar power plant..We have 2DC outputs from the solar panels Connected to 2INVERTOR panels.. Output from invertor is 3ph,280v,500kva,50hz.These are connected to individual ACB.This has to be stepped up to 11KV ,1250KVA SYSTEM.Now can I use (1) one more ACBTO GIVE A COMBINED OUTPUT OF 1000KVA,280V & STEP UP THE OUTPUT BY USING a single two winding 3 ph transformer 11kv/1250kva. or (2)use the two outputs and connect to one three winding transformer of above rating..Pls suggestwith details.
For electrical designers what are the standard should know? i want learn about this standards. how to get information/reference. anybody help in this regards please.
What is the rating of circuit breaker needed for 300 KVA load in 33 KV supply line in a transformer of 33 KV / 415 Volt ?
How to calculate MCB Breaking capacity.
a simple c++ program to calculate simple interst with its data members as private
WRITEDOWN FEW RELY CODES
if an insulated power and control cables of a running gas diesel gensets laid direct in an open trench i.e, trench bed is not rcc of a power house in which rain water, spillage water alwas exists and all power control cables remains submerged even when gas gensets of 480 kw each runningin on load. These power &control cables runs from power house to switchgear room through these trenches in which water remains most of the time. pl explain its merit & de-merit
IF alternator SCR value will be high means what happen in alternator efficency at operating power factor of 0.8
what are factors to be consider to design a HT & LT motor?
Dry type transformers
What is phase cross over frequency?
What is the difference between the relay and the circuit breaker?
comparision between ACB and VCB