how the slump and Compressive Strength of concrete cube is
performed in a civil engg lab ?

Answer Posted / narendra

Apparatus:-Large pan,Trowel to mix concrete mixture,Steel
tamping rod(20 mm dia.),Slump cone,Ruler,Fresh Concrete
(Cement, water, sand, aggregates and admixes).
Steps
Place the mixing pan on the flat and levelelled floor and
moisten it with some water. Make sure it is damp but no
free water is left.
Place the sand in the pan. Add the cement and mix it with
the sand.
Add the coarse/fine aggregate and thoroughly mix.
Mix the water and dry cement ingredients thoroughly using
the trowel.
Firmly hold the slump cone in place using the 2 foot holds
(nut bolt or any other arrangement).
Fill one-third of the cone with the concrete mixture. Then
tamp the layer 25 times using the steel rod in a circular
motion, making sure not to stir.
Add more concrete mixture to the two-thirds mark. Repeat
tamping for 25 times again. Tamp just barely into the
previous layer(1")
Fill up the whole cone up to the top with some excess
concrete coming out of top, then repeat tamping 25 times.
(if there is not enough concrete from tamping compression,
stop tamping, add more, then continue tamping at previous
number)
Remove excess concrete from the opening of the slump cone
by using tamping rod in a rolling motion until flat.
Slowly and carefully remove the cone by lifting it
vertically (5 seconds +/- 2 seconds), making sure that the
concrete sample does not move.
Wait for the concrete mixture as it slowly slumps.
After the concrete stabilizes, measure the slump-height by
turning the slump cone upside down next to the sample,
placing the tamping rod on the slump cone and measuring the
distance from the rod to the ORIGINAL DISPLACED CENTER.

Is This Answer Correct ?    30 Yes 3 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

TO CONSTRUCT A 1800 SQFT CAPACITY UNDERGROUND WATER TANK HOW MUCH CUFT CONCRETE IS REQUIRED AND HOW MUCH REINFORCEMENT IS REQUIRED. FOR COSTING

2090


What is unit weight of roadway layer.. 1.bitumen 2.sand 3.soil 4.concrete 5. aggregate give me some reference for this answers

1838


how many re use can use shutting material. timber ? ply? steel? plastic? fibre? aluminium? Doka?

1946


rate analysis hiring of generator 62.5 KVA

1674


please give me the rates of RCC(CUM), PCC(CUM), Brick Work(CUM), Tile Flooring, Saria Shuttering

1055






show answer/calculate mix 1:2:4 ratio -cement-sand -metal-water

1617


weight of 1 cft 10mm, 20mm, 40mm aggregate weight of 1cft course sand

4573


If u want ur Ans.Of any Question so mail me skatiyar011@yahoo.in

1582


in a corner footing of a building, column lies in one corner. in this condition i want to know if the reactive pressure of soil will be uniformly distributed throughout the footing or will be uniformly varying as in the case of eccentrical loading.

1721


i have a interlock pavement work.i need to compact about 2000 sq metres of sub base grade c of thickness 15 cm.what is the amount of water required for compaction ??

1631


What are the Types Of DPC and its Thickness used?

940


What are the techniques to measure road difference?

748


What is diversion tunnel in a dam?

687


types of survey and levelling instrument ?

1273


how many BSCs can i connect to the HUAWEI MSC

1830