how ranges is decided for drum level or dearator level,in
my pplant i have seen for boiler drum range is -1000 to
1000mmwc, while for dearator -2000 to 0 mmwc ,why they
decided to take this range ?

Answer Posted / tarique

to maintain your sp as per load control,for anti cavitation
in your system it will always monitor true value

Is This Answer Correct ?    2 Yes 4 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

how to control pid

1461


what is droop in governer ,type of droop ,how it work

1772


how do i tune dearator pr control valve using PID. we set the set point is 0.6kg/cm2 now i want 0.5 to 0.7kg/cm2 limits so what should i give p,i,d values. then pls explain how do set pid values for control valve tuning?

1498


hi! i want to know about mpse exam.

1794


Draw a P& ID showing – orifice flange, plate, dp transmitter, isolation & bypass valves and tubing.

1508






how to calibrate corollaries (Mass flow meter)?

1653


sir i m preparing for BARC but i am not getting any papers to prepare for this exam so please send me some sample papers to my i.d for the preparation of barc.

2012


what is the input to be given in digital flow meter during the the calibration time?

1746


i need some objective type questions in instrumentation

4486


we want to control pump in let pressure and tank (for exp) our inlet line if water cam and pump will on and when our tank will full pump will off also if our inlet pressure low pump will off even tank not full.this pump i want to uses on our water supply line.

1287


how to calculate signal cable sizing? and multipair cable sizing??explain in brief?

1907


What is 1:1 redundancy ?

1888


Calibration procedure for water rotameters

1761


What is 3 element control system

1020


What is Span Error

213