What are the technical reasons for soaking transformers for
various times before allowing them to pick load after a
fault ?
Answer Posted / al kafaah
I think the transformers are soaked with normal operating
voltage level as testing with HV of the transformer
insulation, winding at site is impractical as well not
economical. Besides soaking allows the transformer
insulation to be tested for operating voltage such as oil
(so that oil inside is not breaking down) or winding
insulations, short circuits, inter-turn faults (though
these items are individually tested for its correctness at
site test, but not as a whole unit at Normal operating
voltage). Whereas the Switchgears and Cables which are
other Primary circuit components are tested with High
voltage even at site
Is This Answer Correct ? | 25 Yes | 8 No |
Post New Answer View All Answers
Block diagram of Power line communication?
which cable is used for 15 Hp monoblock pump 3phase and service wire Distance is 210 feet please tell me cable size Armaured
what could be the RMS value and average value of a 4 phase sine wave?
2 v/500amp/hr to 1.80vpc at 20 degree celsious 2v/5ooamp/hr to 1.75 vpc at 77degree farren .this is the capacity of a battery .what is the meaning of this . can i get a detailed explenation
please suggest some good universities with low cost iam in totally full confusion so please help me my profile gre 283 and ielts 5.5
what is Fan Control Cubicle
Dear friends, i would like to know that what is the exact function of 'exciter winding' & 'aux winding' in Alternator?
Whether amorphous core transformer is available in India?.If available then up to what rating of voltage and KVA?.
Tell me all plants load factors i.e which plant operating on which load?
why we use Test Terminal Block in 11 KV and 33 KV electrical panels.
tell me some type of questions throught which i can prepare for exam and do my best
How cmd is calculated in case of energy neters
can anybody sent me power grid questions. what subject should i prefer for preparation?
WHat is the requirement of installing FAST ACTING EARTH SWITCH in GIS and how is that integrated with protection system. How and when does it operate?
If oil and air can withstand a high MeV when used as an insulator in a transformer, what are the values of how high for each material?