sir i have applied for isro-09.
still i did not got the HALL TICKET.
Answer Posted / pinky
Go to isro website and check the status of ur application
once by giving ur registration number and date birth.
| Is This Answer Correct ? | 3 Yes | 0 No |
Post New Answer View All Answers
what is buffer resistance starter.?.What is the working principle and where it is used..?
We have a distribution transformer of 750KVA/11kv/440v and an AVR (Servo Stabilizer) of 750KVA on the LT side of distribution transformer. Also we have an ACB of 1200A on the output of distribution transformer (that is on the input of AVR). We want to have an MCCB on the output of AVR. What should be the rating?
hi....I am from india..i have completed my engineering in electrical and electronics field with 58.4% and my IELTS score is 5.5 bands....Recently i received my I-20 in computer and information science from Troy university in Alabama.On 18th i have a visa interview can u please tell me what type of questions i have to answer ??????
what is allowable ac mixing in dc
IN induction motor pf is increased using capacitors.what will be the effect on motor and system when very large capacitor is accidently installed and pf goes leading.
Which is the largest hydropower station in the world?
How can we checked Killo Watts of Motor & Alternator?
Please elaborate th´evenin’s theorem?
How cable from Kit-Kat to main switch, from starter to motor are designed?
in shunt clippers why a resistor is used in sereis with the input
Calculate torque developed by the 3-phase, 5 H.P., 4 pole induction motor runs at 1500 rpm A 23 N-m B 21 N-m C 10 N-m D 0 N-m
What is lc oscillator?
why single phase to grd test in HV cable?why not 2 phase at a time?
List examples of current sources?
what is meant by re-rolling motor? how it differs from standard motor?