What is standard sand?
What is coarse & fine sand?
What is foundation?
What is the seze of hooks in various Reinforced section?
What is the formula of providing clear cover?
What is the basic diff. between working stress & Limit
state design?
What is &cbc and fck?
what are the primary & secondary test of water purification?

Answer Posted / sjtbehera

Standard sand means which obtained from nature, like river
sand
According to IS code sand which passes lower than 4.75mm
and above 600milimicron and fine sand which passes 600 mili
micro and retained 75 mili micron.

Foundation is the part of structure which transfer load of
the structure to the base of soil on which it rests.

hooks- semicircular secn.-16d
90' bend- 8d
45' bend- 12d
Clear cover- column-40mm
BEAM - 25MM
SLAB - 15MM
FOOTING - 50MM
lIMIT STATE DESIGN- in this method design based on limit
state concept, the structure shall be designed to with
stand safety of all loads liable on it throughout its life.
it also satisfy the serviciablity recquirments such as
limitation on deflection and cracking. the acceptable limit
for the safety and serviciable recquirment before failure
occurs is called limit state.
working stress- when limit state design are not acceptable
working stress method is used. in this method is based on
elastic theory.
cbc- compressive strength
fck- charterstics strength

Is This Answer Correct ?    60 Yes 10 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

How we calculate the service time of buildings

1434


Explain creep?

695


What is the frequency of sampling for the materials of cement,Fine aggregate, Coarse aggregate .and refer which code

1855


What is the release of lien?

698


How to get MEP technical,instaaltion & testing data for interview?

1612






Power grids in two adjacent states(A&B) are interconnected. Can power grid in state A can be represented by Thevenin Equivalent Circuit. If not explain Why?

1894


What are the ingredients of pre-stressed concrete?

783


Trapezoidal section footing calculation of Volume & its Area

32035


How to do rate analysis for concrete work including shuttering work?

1562


Explain the latest method to detect a crack in a building?

684


1m square 20mm plastering how much of water need curing work

1463


What is change order request?

680


what is the metal ratio in granular subbase coarse for one cum ? And please explain the morth table ...what is the difference between grading 1 , 2, 3 what it means..plz explain

1323


How to build the floor to ceiling bookcase?

830


i have applied 40mm spacer in the concrete for tie beam. is it correct? kindly give me if there any code available

1459