Why one can experience electrical Shock due to Voltage or
Current?? or both voltage or current??

Answer Posted / smita

EXPERIENCE SHOCK BECAUSE IF THERE IS ANY POENTIAL
DIFFERENCE THEN CURRENT WILL FLOW AND SUPPOESE HUMAN BODY
(WHICH HAS SOME RESISTENCE) IS IN CONTACT THEN IT GIVES LOW
RESISTENCE PATH TO IT AND THE PERSON WILL GET SHOCK

Is This Answer Correct ?    4 Yes 2 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

TRAFO 1. WHY BREATHER IS USED. 2. WHY OIL GOES DOWN IN CONSERVATOR TANK. 3. WHY WE ARE TAKING OIL SAMPLE TAKING FROM BOTTOM OF TRANSFORMER. 4. HOW TO CHECK IR VALUE OF TRANSFORMER. 5. WHY OLTC HAVING BUCHHOLZ TRIP ONLY; WHY NO ALARM. 6. OFF LOAD TAP CHANGER OPERATION PROCEDURE. 7. TR. SHUTDOWN / ISOLATION PROCEDURE. 8. WHEN THREE TRS. IN PARALLEL, ONE TR. IS NOT SHARING THE LOAD – WHAT IS REASON AND WHAT YOU WILL DO. 9. WHY TR. HAS OLTC IN HV SIDE. 10. WHAT IS % IMPEDANCE. 11. WHY TR. RATING IN MVA. 12. WHAT IS VECTOR GROUP IN TR. 13. CONDITION FOR PARALLEL OPERATION OF TRS. 14. WHAT IS TERTIARY WINDING. WHERE IT WILL BE. 15. IF TR. TRIP ON BUCHHOLZ OR TAP CHANGER RELAY, WHAT YOU WILL DO. 16. DIFFERENCE BETWEEN OIL TEMP. AND WINDING TEMP. PROTECTION 17. HOW WINDING TEMP. IS MEASURED IN CAST RESIN TR. 18. DIFFERENT TYPES OF FAULTS IN TR. Trafo - Page-1 of 2 19. WHAT HAPPENS WHEN TR. CHARGED FROM LV. 20. WHAT WILL YOU DO IF MEGGER READING SHOWS ZERO BETWEEN LV WINDING AND EARTH. 21. CAN WE INTERCHANGE BUCHHOLZ RELAY OF MAIN TANK AND OLTC TANK. 22. IF THE LINE BETWEEN BREATHER AND CONSERVATOR TANK 23. LOCKED, WHAT WILL HAPPEN DURING LOAD CYCLE. 24. WHAT IS THE FUNCTION OF OIL SEAL IN BREATHER. 25. WHAT ARE LOCATIONS FOR BUCHHOLZ RELAY FIXED IN POWER TR. 26. WHAT ARE CHECKS IN POWER TR. DURING MAINTENANCE. 27. WHAT IS IMPORTANT WHEN WE CHECK OLTC OPERATION DURING MAINTENANCE. Trafo - Page 2 of 2

2001


which one is more efficient, torq, power & ecnomy with the same frame size AC motor / DC motor?

1704


how hazordious area is classified at an oil & gas plant and categorise suitable class of electric equipment in that area like induction motors, LCS, Lighting Fixtures Fluerescent/Flood lights Mercury& sodium lights, J.Bs, Power Cables etc

1352


explain the function of brush less dc motor?

1576


Sate maximum power transfer theorem?

701






1.Z transform always lies around ? a) origin b) pole c) zero d) z=1. Multiples Mcqs which is bother me can’t find answers on internet. Some help required with little explanation . Note: this is not homework or related to any test. Thanks

1938


at what rate the micro controller increment its timer....is it 1micro seconds or 1/(12*10^6) seconds

1348


can the measured percentage error during calibration of single phase energy meter be negative?

1923


what is the defination of Cable database? What are the points are considered while preparing cable database? Is there any sample available for cable database?

1426




1902


For an induction motor wat is the loading/unloading cycle duration or interms of L/UL ratio/ percentage?

1592


State kirchoff voltage law?

686


Is single load(eg: three phase motor) having all the components like positive,negative,zero sequence components during fault condition?

1355


An ISP is granted a block of addresses starting with 150.80.0.0/16. The ISP wants to distribute these blocks to 2600 customers as follows. a) 200 medium size businesses; each needs 16 addresses b) 400 small businesses; each needs 8 addresses c) 2000 households; each needs 4 addresses Design the subblocks and give the slash notation for each subblock. Find out how many addresses are still available after these allocations.

7014


how to get electrical supervisor competency certificate in gujarat. i did 3 year diploma in electrical

2074