Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

sir, plz tell me how much kvar capacitor required for 1000
amp or 500 Kw load ? what is the formula ?

Answer Posted / deepak

kVAR=kVA X sinphi
SO, sin phi=(1-cos sq phi) underroot.
SO POWER FACTOR IS REQUIRED.

Is This Answer Correct ?    7 Yes 3 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

What is the magnetic field (coil DC ) of Turbo Expander?

2080


what is calculation mathod/formaulla for deciding Size of busbar (Copper/ aluminum)for L.T. panel on Various Fault level like 50kA,25kA,10kA

2804


Single line diagram for dbb (double bus bar)system.

1959


why the check zone and main zone are used for Busbar Protn. scheem?

2201


condition Autotrip facia come on control panel of electrical transmission line?

1584


I am going to appear RRB Sr. Section Engineer Exam, Electrical. Can you send me previous year questions of RRB Electrical engineer. specially Section Engineer questions. my email id is likerahulworld@gmail.com

1820


explain which quantities change in the starting and the and the running condition in induction motor

1455


"TRANSFORMER MODELING AND ANALYSIS" MEANS WHAT AND WHICH TOPICS U READ IN THIS

1899


explain supply side and demand side energy management with advantages & disadvantages

2156


what is th basic difference between a d latch time line and a d flip flop time line???

1993


How to calculate no of Lighning arrestors are required for protecting 50mX 50m*20m cubical building and locations of LA?

1841


How is the gain affected by the introduction of feedback in a control system.

1175


How to calculate fault level of 11 KV system

2092


How to prepare electrical preventive maintenance plan & shedule of machine tools in manufacturing unit.

2190


Why using synchronising methed in DG's sets?

2235