what is purpose of using reactor in substations.

Answer Posted / bl meena

reactor-coil having high inductance compared 2 its
resistance,it's used 2 limit short ckt. currents.

Is This Answer Correct ?    44 Yes 7 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

how to set relay setting? and example calculation...

1521


In case of generator when we consume more power produces by it why load on generator increase and starts sound more. and how it is adjusted..

1432


plz send me the placement interview question and answers of whizchip(technical and apttitude)..i have an interview in next.

4516


pls,send the previous year written test questions.

1446


Power Factor Correction Panel (Manual & Automatic)

1688






A TRANSFORMER 440/400V,DELTA/STAR CONNECTED.THE NEUTRAL CONNECTED WITH GROUND CABLE THAT IS DIRECTLY CONNECTED TO THE PANEL,FROM PANEL IT IS CONNECTED EARTH PIT.IS IT RIGHT? IF IT IS RIGHT LEAKAGE CURRENT AFFECTED.SECONDATY IS PROTECTED WITH EARTH LEAKAGE RELAY.

1709


how to check avr of dg set of 125kva

2152


1.why we are using metal oxide gapless block in lightning arrester,2.What is minimum and maximum rating of metal oxide blocks using in india

1517


Differentiate between digital phase converter and ordinary phase converter.

762


How to size Air Circuit breaker (ACB)? What is the most important factors?

1792


description with working of all parts of a Diesel generator???????

1985


What is the end effect of linear induction motor ??

1574


which is chemical used as in ro water what is difference betweeen multi grade filter&dual media filter

1636


What is Plank's Law?

688


Please help me regarding my one concern. - During earth pit testing we noticed that the Clean earth pit and dirty earth pit showing continuity (Resistance value - 5ohm) . I want to know that if both earth pit have separate location and there is not internal looping between PIT then why such continuity is showing on it . Because of this issue the field side all earthing point showing short. In PLC panel we are providing two types of earthing cable which is coming from separate earth pit (Clean and Dirty earth pit) because of earth PIT showing short our PLC is not complying spec . please help regarding this issues.

1099