who much should be the lap length in reinfocement
Answer Posted / koushik
its n times D,where n depends on the structural element.for
example fpr footings its 50 D like that............
Is This Answer Correct ? | 34 Yes | 8 No |
Post New Answer View All Answers
Where can I get a Text Book on Design of Blast Resistant Buildings in PDF form.
01. a. Diagram of a slump cone…………… 1 b. Size of Slump Cone…………… 1 c. Volume of a slump cone by av. Dia method…………… 1 d. Volume of a slump cone by av. area method…………… 1 e. Volume of a slump cone by frustrum method …………… 1 f. Angles of slump cone …………… 1 g. Slump measured by slump cone due to…………… 1 h. Slump does not measured by cylinder / cube due to …………… 1 i) ii) i. Slump cone is to be filled in……………………..Layers.
How to find weight of steel in kg if we know the area which is in m2? Following details are known to us, Area=125m² thk of slab=250mm Steel details:T12@200 PS:considering mesh top and bottom with X and Y direction
1. For 10sq.m area(47 kg bitumen contain) of 45 mm thick bitumen mix layer..how much bitumen is required for 1600 sq.m and how much aggregate need for that ?? 2. And much tonnage of bitumen mix required for 10 sq.m area of 45 mm thick. Please give answer...
Any strength is a stress but any stress is not strength
what is the Asfalt test?in road constraction..?
Required amount of Steel bars, cement/ square feet for roofing of residential building upto 3rd floor.
1. What is coefficient use for calculation of shuttering. 2. What is coefficient use for calculation of reinforcement in one cum of concrete.
could u tell me how to used deform stell bar in reinforce concret?i wanna know the general using in the site!
hoe much fine & sourse agregate required for concrete mix of 1: 1.5:3 by volume in Cu.Ft
What is the general specifications of a bituminous pavement road?
what is labour consume factor in residential projects
hi guys what happens if you are absent for a supplymentry exam?
Define What is rigging?
How to calculate the cement consumption in RR Masonry in CM 1:8 for the foundation of Ground Level Reservoir