Answer Posted / zulkifli abd. rahman
maximum demand is calculated and bill by a kW demand meter,
which record the highiest kW value consumed in one 30
minutes period, over a monthly billing cycle.
Is This Answer Correct ? | 12 Yes | 13 No |
Post New Answer View All Answers
In CTs tan delta point should be earthed , what is the reason behind it?
what is the formula of starting current of 3phase and 1 phase motor???
how i calculate the syncrones generator NGR resistance .if we have a 6mw generator line voltage of generator 11kv also line current 393.3 ampere.
sir please send me iocl written test paper in my e-mail account. i'll be obliged to you........ thank u roshan
Why colled 440V to 3-phase supply.
what is difference between cpp electrical system and refinery electrical system
Why is ignitor used in sodium vapour lamp
what is the difference betweem star connected motor & delta connected motor?
how we findout a ignater is faulty or not?
WHAT IS MEANT BY SHEATH VOLTAGE IN 132Kv cable?
what are the industrail measures to over ferranti effect? how would the ferranti effect the power system if those remedial mearsure arent taken? how often does this effect occurs in real power system?
design a LV scheme for a 15 storied building?
Electromagnetic torque developed by the motor is compared to shaft torque. A less B same C depends on motor design D more
why US countries maintains 110v and 60HZ
I am applying for NTPC examination.Can we please provide previous paper to my mail prasad.chintala108340@gmail.com