hi friends,can u send me the link for downloading
Allen_bradley_RsLogix_500_Pro_V_7.0 software with
activation file.or how can i find activation file for this.
Answer Posted / ash
u can find in isohunt.com
but not sure whether its work or not.its expensive software
& normally used by only industrial people.we were lucky
enough to work & it in the company where we did our intern.i
think now latest is 5000series on which we worked...
| Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
what is the difference between -24 : +24 & 0:24 and where it use?
what is interlock system and why we use of this?
What is loop1 and loop2 in MTS LT?
Gas equation
what is compensation? temprature & pressure
What is stripper & spilitter ? Diffrence in this.?
How do you identify an orifice in the pipeline?
how to calculate signal cable sizing? and multipair cable sizing??explain in brief?
what is the protection system in solar turbine compressor
why is not useing in boiler skin thermocople
give me all the details about the interview and which type of question being asked
A PLC is programmed to drive three motors A, B and C as follows : After running motor A for an hour, motor B should get ON and motor A should get OFF. And after running motor B for an hour, motor C should get ON and motor B should get OFF. And after running motor C for an hour, motor A should get ON and motor C should get OFF. (That is, a cyclic repetition with time period one hour) Now, the second condition is: If any motor gone faulty and is tripped, the consecutive motor should get ON and the faulty (tripped) motor should be eliminated from cyclic repetition. The remaining two motors should bear the cyclic repetition of one hour each. (For healthy motor take logic as high and for tripped motor take logic as low) Now, the third condition is: When motor A load(Amps) exceeds 60% of its rated load, motor B should get ON in parallel to motor A. And when both motors A & B are running in parallel, and if their load exceeds 60% of their rated load, motor C should also start in parallel to A & B. [Here the cyclic repetition is eliminated, until their loads become normal(40%)] [Take logic high(1) for load at 60% and logic low(0) for load at 40%] Now draw a flow chart or a ladder diagram to fulfill the above condition.
what is interface level and how it is calibrate?
how many types of preheaters are in cement industry & what r they can any body explain?
i have been asked by QAFCO to appear for interview for thy post of Instrument Designer(INTOOLS)..i m engineering graduate with 5 years exp. in design engineering.Will this job profile suit me??i need all ur help n suggestions for thy same?