how to callibrate a new i/p converter

Answer Posted / guest

hi sanjay
1. AIR SUPPLY
I/P input - 1.4kg/cm2
Out put - 0.2 to 1kg/cm2 ok

2.input signal= 4-20 mA

i.connect the air supply to input with the hepl of REGULATOR i.e 1.4kg/cm2
ii.connect the MASTER GAUGE to OUT PUT ok

Apply the signal

i. 4mA- 0 kg/cm2 (if not Zero/0.2kg/cm2 Adjust Zero adjustment Screw)
ii. 20mA-1 kg/Cm2 (if not 1kg/cm2 Adjust Span adjustment Screw) ok.

then 8, 12, 16mA.
min. and max. is ok the remaining will perfect automatically i.e 8,12,16mA.

and MAIN IMP POINT is ON the I/P's Ckt board Side 4 adjust ment buttons is there and adjust that buttons Direct and Revese Actions ok

Is This Answer Correct ?    20 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

applications of plc in printing and packaging?

1676


Explain bernoulli’s theorem. State its application.

682


What you mean by multi stage control vavles?

1380


Explain the working of an electronic level troll.

599


detail of mass flow meter pricipal

1825






what is piezoelectric transducer?give an example in power plant n state its principle?

2073


Pressure tx shows 1 mbar but we need 1000 mbar at this process condition .. how can we sort it out .

1197


typical loop drawing of a simple feedback control comprising of one transmitter and one control

1564


which type of signal used in instrument?

8585


How u will setup SPI(2007) on Citrix Server (Thin Client Mode)? Plz Justify?

1592


explain key exchanges in all security modes WPA,WPA2,TLS?

1497


in mass flow meter what is drive friquancy ?

1623


What is PDS and PDMS ?

1695


what is the difference between scaler and vector drive

1665


Why even multiple power supplu r used in instrumentation system?

4159