Based on CPI/CGPA they shortlist the candidates & than
directly start Interview so there is no Written Exam or GD
Only PI.Interview held @ MNNIT , ALLAHABAD On-Campus on
6th,Aug, 2007 & the Questions asked to me by Interview Board
( 4 People) are from HR/SummerTraining/BTP/Subject-core,
POWER SYSTEM & MACHINE. time duration of I/V is about 15-20
Minutes.

HR-

Q.1 Name,hobbies & About family background ?

Q2.What u know abt NTPC ??

Q3.Why u want to choose NTPC as ur Carrier's starting i.e
power sector not any other Oragnisation or sector ??

Techincal Questions-

Q1.What is the reason for transformer Noise ??

Q2.Which material is used for making Transformer oil & How u
measure its dielectric strength & Name the test ?

Q.3 Which Machine u will prefer 2 use if flammble gases are
coming out at a place & why ??

Q4.What is relation b/w Transmission Lines & Communication
Lines ?

Q5.What is the maximum capacity Synchronus Machine & total
powerGeneration in our country ?

Q.6 In india Power generation is at 50Hz while in America
its 60 hz ,why so ?? Advantage or disadvantage ??

Q.7 Maximum Generation Voltage in india ?

Q8. What is the Voltage regulation & why its required n how
much is permissible ? & causes of voltage variation ??

Q.9 Why electric shock is feel ?? n in a Electric Train why
we didnt feel that ?

Q.10 Have u seen/ experience of any power plant/ industry
related to the power sector ?

so these are the questions which not too diffcult i
think was asked to me.

Answer Posted / divya

Can you please give me the answer for Q) 3, 5, 7, 9

Is This Answer Correct ?    0 Yes 1 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

Some times to change of DOR of a motor, interchange of R & B is not effected and RYB take same current, but interchange of R&Y is effected ie change the DOR. My doubt is what is the problem in motor and how it is happen.

1545


When distance between two pulleys is not fixed, the tension of belt is adjusted by a) driver shaft b) driven shaft c) adjustment screw d) belt

2441


Haw to check conductivity of budbar

1345


for opening electrical shop, tips needed.

1393


What is ignition module of a CAT Gas Genset G-3508 Engine, Alternator SR4B Series. HOw its checked for correct functioning.Is it repiarable or replacable?

1456






WHAT IS THE MEANING OF BALANCED / UNBALANCED IN STABILIZER TYPES.

1974


what is the difference between "Rotary bypass isolation switch and Normal bypass switch" pls share indepth techs?

1618


How we select the vector group of 3phase power transformer?

1993


Earth has zero potential then what would be the neutral potential ?

933


At what speed 1 HP motor can run an electric car of weighing 400 kg?

1145


how we can calcultae the short circuit level for bus bar

1733


What is effect of over voltage and under voltage on ACB

1402


What is the previous name of Cox's Bazar

1704


Sir,In our company there are 3 caterpillar make(capacity:(1) 3.3KV,2.5MW(2)3.3KV,2.5MW & (3)3.3KV,1.9MW) & 1 deutz make (capacity:11KV,3.8MW)gas engines utilised,all are running in paralell. There are three transformer utilised,(1) 6.25MVA,3.3KV/22KV,Impedence voltage:6.7% used for two generator,both are 2.5MW(2)5.5MVA,3.3KV/22KV,Impedence voltage:7.2% used for one generator of 2.5MW & (3) 5.5MVA,11KV/22KV,Impedence voltage:7.8% used for one generator of 2.5MW.all generator breakers capacity of 1250Amps. Sir,I want the details of fault level calculation of generator,transformer individually & for whole system. If you require any information from me.feel free for contact me sir.pl.send the answer of my question as the earliest as possible.

1661


Difference between Earthing Truck & Earthing trolly for HT panel

3818