Answer Posted /
| Is This Answer Correct ? | Yes | No |
Post New Answer View All Answers
Describe the Big-O Notation.
state two major differences between the practice of personnel management and human resource management.irrespective of these is practised what needs to be measured?
Which is the default for synthesized properties?
Explain database link?
How is SPA (Single Page Application) technology different from the traditional web technology?
How to calculate that clean water supply in one Day from 150 KLD STP?
Why is it necessary that file needs to be opened in I-O mode for REWRITE?
Explain about memory management in operating system.
Can you draw DFD?
What is the team size,duration and project manager name?
Design a reinforced concrete combined footing (rectangular) for two columns located 3.60 metres apart. The overall sizes of the columns are 40cm x 40cm and 69cm x 60cm and the loads on them are 1000 kn and 1500 kn respectively. The space available for the width of the footing is restricted to 180cm. The S.B.C. of the soil is 280 kn/mm2 use M15 concrete.
List few components that are using big data?
Tell us about a time you faced a challenge. How did you deal with it, and what motivated you to keep going? : insurance cold calling
What is sap market place?
Which key can be used to execute a query in the query editor?