What is the purpose of starter and choke in tube light?
Answer Posted / rajendra singh
The purose of starter and choke in tube light circuite,for
start-up the tube lights.
The choke work as a blastand induced 850V to 1100V in
starting,by strarter make and break of the circuite. After
glowing the tube light choke work as inductance and provide
110v to circuite.
Is This Answer Correct ? | 204 Yes | 56 No |
Post New Answer View All Answers
How to use computer cpu ups use for home inverter circuit board
For group 1 , 2 whather i have to prepare my technical or general studies etc? and im graduate in ee engg. for wht posts im eligible for? please tell me!
What Is Sampling?
is there any phase difference occurs while primary and secondary side mutual induction occurs?
What is servo motor? what is its purpose?
How maesure earth neutral value & how much maximum value value required in between earth & neutral.
Is there a standard depth of gravel fill in Substation Switchyard? Please give a design/drawing. Thank you.
draw a circuit diagram connecting transformer OLTC- RTCC- VCB-Marshalling Box otherwise Explain in words
PLS SEND THE RRB CHENNAI MODEL QUESTION PAPER my email id is ganesan98655@rediffmail.com
what is invertor supply and raw powersupply
What is the Designing & Selection Procedure for a DG/Transormer of rated capacity?
I am B.E.electrical engineer having 7 years of experience in Transformer testing upto 315 MVA.I want to khow how I can get the 'Electrical Valuer' License.
We are preparing another project which involves Waste heat recovery from a 1 MW GE Engine. The Engine in particular gives out flue gas at 487Deg C with a flow rate of 5650 kg/hour and this can be cooled to 180 Deg C. This gives a thermal output of ~ 594 KW that is available for input to VAM via heat exchanger / boiler. Additionally 581 KW will be available from engine jacket water (temperature profile 80/ 80 Deg C and a flow rate of 50m3/hr) Our estimation is that 300 TR of cooling is possible with a suitable VAM machine(s). Please advise what is the most suitable arrangement with maximum TR and min Capital expenditure. plz reply me as early as possible
How LT megger works ?
How Calculet The UPS AH In Load