Why all voltage levels are the multiples of 11KV?
Answer Posted / johince
Multiples of 11 has no role decoded from form factor and
anything like that (I believe). the relation to form factor
is just a coincidence.
In early days when technology has not advanced this much,
the transmission lines consumes around 10% of the total
power transferred. Normally loads are designed as multiples
of 10 or 100 KW. So the generation done for required load
power + transmission loss. ie 11KW, 110KW etc. So generated
voltage also was designed as multiples of 11.
Hence the insulators has to be designed for these volatges
and hence the form factor coincidently derived as 1.11.
| Is This Answer Correct ? | 35 Yes | 56 No |
Post New Answer View All Answers
what is capacitor voltage transformer?? how it is different from potential transformer?
Why is the frequency not changed during transformation of electrical energy in a transformer?
does a DG set has low fault level as compared to that of a transformer.If yes then why.
As per standard, transformer body earthing and other Equipment earthing (Equipment earthing) did not connect. but in LT side termination we are doing metal glanding in both side Transformer to PCC Panel through armoured cable, now X'mer body earthing and PCC Pane earthing (Equipment earthing) both are connect.is this safe for X'mer or other equipment?
Define super node?
can any one provide me a connection wiring diagram for a DG set control panel along with BOM?
What is VCB? where it is installed at SP. What is SP?
DIFFERENCE BETWEEN NORMAL TRAFO AND THRISTER TRAFO?
1) Explain why we don't link the two earthing system ht and mv on a pole mounted transformer sub-station.
what is maxemo work permit procedure
How to choose the vector group for the step up and step down transformers??? Tell me the which vector group is suitable for step up and step down transformers and whats the reason to choose and whats the benefits???
For the requirement of a furnace of temperature range up to 1200 oC using silicon carbide rods, What is the required rate of transformer needed (please do it with all details)?
what is the physical connection of a analog i/p to a analog i/p module (ab plc)and through a analog o/p module(ab plc) to a analog o/p . and how all the process control by scada
What Normal(Tangent) towers and Tension(Cut-point) Towers?
Why mostly the HV side of transformer has Delta?