Answer Posted / abhishek d. rathod
Civil Engineering is a process not destination.
It is an art to give shepe to future & impossibilities &
by that letting others to wonder.
Is This Answer Correct ? | 6 Yes | 3 No |
Post New Answer View All Answers
Q 1) 1 Mason and 2 LABOUR / _________CUM brick work Q 2) 1 Mason and 1 LABOUR / _________SQ FT Plaster work Q 3) 1 Carpenter & 2 Labour/_________SQ FT shuttering work Q 4) 100 SQ FT roof slab concreting ____________mason and labour required
How to arrive dry volume of concrete (1.52 to 1.57) ?
WHAT IS THE % OF CONCRETE WASTAGES PERMITED IN A LARGE PROJECT ? AND WHICH IS CODE TO BE REFERED.
Is it necessary to apply tack coat over the primecoat. IF not what happens.answers other than 1.to superimpose the next layer(2) to adhere the layers so as to form homogenity.
what is tension footing?
what is the relation between pitch of steel and depth of slab?
what is the difference between prime coat and tack coat in road construction
Used Cement & Sand in 1 Square Meter or 1 Square Feet For Brick Work 0.115mm ? (1:4) (1:6)
what is mc arther pile?
As we know that steel is a tension member but why we are using STRUCTURE STEEL as a COLUMN (Without concrete) where column is a compression member and compression strength of steel is very low
how to calculate total cost for slab 35'×8'
how much area can be platered by a mason for exterior
where i can get material costs on weekly basis
What is rate of concrete surface rendering work per sqm
How much cement and sand are required for 1 square feet of plaster at a thickness of 15 mm at a ratio of 1:4?