Answer Posted / vijendra singh
civil engineering
it is a line of construction in which we consider all tye
of possiblities, like earth quake, wind load, dead load,
requirement form the client
Is This Answer Correct ? | 5 Yes | 5 No |
Post New Answer View All Answers
Define different types of roof systems?
how much cement and sand consuptin in 4 inch siporex walls 100 sq ft
What is the requirement for over all CG of DG from the foundation surface to absorb the vibration of heavy set.
What is 1/8 on the architect ruler denotes?
How does siphoning work?
WHAT IS THE MAIN DIFFERENCE B/W HIGHWAYS AND MOTERWAYS?
How to calculate the weight of sand am 20mm course aggregate in 1 c.m M25 concrete Which use 400 kg of cement ?
A sieve analysis results in 100% retained in no. 50 Sieve, the fm is?
During reclamation how can the occurrence of mud waves can be rectified?
Define What is a projection line?
Sir, Iam Applied in rrb for the posts of Junior Engineer.I want to know about the or question previews to study well.Pl send it to shukla_varun1985@yahoo.com.
On what basis we decide the formation level of the road? other then that of 50% Cutting and 50% Filling??
what is the max. area can we apply the plate load test ?
A rock anchor 3 1/2” in diameter is placed in rock. The which has an allowable shear strength of 1200 psi. Determine the required anchorage length to safely carry a 80 ton load using a 2.0:1 F.S
Define What are the reasons for geotechnical site investigations in Uganda?