Answer Posted / vijendra singh
civil engineering
it is a line of construction in which we consider all tye
of possiblities, like earth quake, wind load, dead load,
requirement form the client
| Is This Answer Correct ? | 5 Yes | 5 No |
Post New Answer View All Answers
What is difference between engineering stress and true stress?
Which code is used for tor & tmt steel bar?
why does the most of civil engg is not intersted to going for teaching field?
What is specific gravity???
What is the significance of cost estimate knowledge for an architect?
I would like to get the formula How can i calculate the productivity of a mason in terms of brick laying and plaster. i have 6000 Sqmt of interlock laying work i want to calculate - how many masons required to do the job - in how many days can it be done - what will be the production rate in 8 hours shift/ per mason if i can get some excell sheet , it will really help me in my calculations
what is detail procedure of eccentric footing? plz. give solved exmple?
use ofr concrete as per grade ?
how meny typs of renging rod?
a concrete mix 1 2 4 by volume with water cement ratio as .6 by weight if moisture content in F.A is 6% with 20% BULKING AND IN C.A 1.5% by volume. find quantities of different materials required for one bag of cement
Journal entry Gross salary 10000 Tax 1000 Employee contribution 2000 Employer contribution 2000
which type of instrument included in plumbing work?name of instrument?
List out some of the checking’s, done at the completion of construction?
How to calculate Cement in bags ,sand in sqft and aggregate in sqft for 1cum M25 grade concrete
What are the different types of foundation?