11kv/0.433kv, 2 mva , transformer , for protection and
metering how many CT/PT are required?

Answer Posted / k n naidu

hi,
one three phase set of PTs for both protection & metering
and one three phase set of CTs with two secondary cores one
for metering and protection are required.

Is This Answer Correct ?    1 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

how i can calculate the size for fire cable

1500


What does the term power factor shows?

603


What are the significant parts of dc generator?

639


Hoe do calculate the Cable size for Amps rating ?

1691


(1)Can earth and be conected together (2) what is the diferent between earth & neutral

1304






best manufacturer for busbar for outdoor switchyard having double bus bar scheme, can any one share technical specification of busbar. 132kv voltage ?

1251


how to setting Load amps tripping time and extra settings for load Transformer protection relay with RMU panel using C&S model relay..?

594


HOW WORK HEAT PLATE EXCHANGER

1528


any body,pls tell me how to done relay coordination ? how to coordinate by TCC curve?how to read the tcc curve?

1824


sir i want previous entrance exam papers for written test

1696


How to derive detailed design of Suitable bus Bar for 100A for 6.6KV?

1451


what is the difference between earthing and unearth

2372


what is meaning of bus riser

1950


What are dependent sources?

664


What is the difference between electrical earthing and electrical grounding?

685