Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

DIFFERENCE BETWEEN POWER AND CONTROL CABLES

Answer Posted / rvg

Power cable mainly intend to use transfer of power,
specifically current, over a defenite length.
According to the rating there will be change in the no. of
starnds etc for a.c.

control cables are mostly paired cables ,sometimes more
flexible than power cable. and are not intend to carry more
than 10A.(max.).

Is This Answer Correct ?    39 Yes 5 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

Please explain me abt PQ diagaram in the power sector.

2432


mention hazard experienced during installation

1984


Could u pls tell me the NPCIL electrical engineering interview questions for Executive trainee, and also guide me how to face the interview.

4493


Currently what is the highest capacity (MVA) of SPPg generator available in the market?

1819


what is the reason the main breaker is trip during the motor is running? (some time the breaker is not trip)

1794


how to carried out tan delta test in 11 KV alternator ?

3079


Why is the frequency not changed during transformation of electrical energy in a transformer?

1412


xpression 'document.FrmQF.myemail' [

2006


How a band pass filter is constructed?

1072


Which type of questions well asked. ?

1711


what will happen if the prime mover on the field excitation of the on-coming generator fails?Explain.

5563


how many joints are allowed in underground HT cable of 1 KM

1883


during installation time of transformer and alternator which points we have to observed?

1965


A commercial Building is designed with 14th floor levels with indoor substation of three phase transformer with rated capacity of 1000 Kva.The transformer delivered 65% of its rated capacity at 0.67 power factor lagging.Because of low power factor, the power customer was penalized and certain cost was charged accordingly based on every point percentage lower than 85%.This situation may repeatedly happen on the succeding energy bills of power customer.The power customer is desired to improve its historical power factor of 0.67 lagging and no further penalty be impose by the local power company on the next bill. Q: Identify the appropriate solution you want to offer to Client?.Justify SCIENTIFICALLY and MATHEMATICALLY the principles behind the solution.

1807


What do you mean by pull of electromagnet?

1040