Answer Posted /

Is This Answer Correct ?    Yes No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

Which of the following are the tools and techniques of the Cost Budgeting process? A. Project management information system, analogous estimating, bottom-up estimating, mathematical analysis B. Analogous estimating, bottom-up estimating, mathematical analysis, computerized tools C. Project management software, analogous estimating, bottom-up estimating, parametric modeling D. Analogous estimating, bottom-up estimating, parametric modeling, computerized tools

510


Explain the features of an abstract class in net.

492


documentation on improved trace buffer via Selective Data Capture Using 2-D Compaction for Post-Silicon Debug

1457


i WANTED TO USE THE RANGE LOOKUP SCENARIO IN DATASTAGE 7.5.2 SRVER JOB.i HAVE A DATE FIELD IN SOURCE AND I SHOULD MATCH IT WITH A FIELD IN LOOKUP FILE.BUT,THE FIELDS SHOULD MATCH EVEN THOUGH THERE IS SOME RANGE.CAN SOMEONE TELL ME HOW CAN I DO THAT. THANKS

3307


What is xml and why it is used?

455






What is specification-driven testing?

736


Can you list down some of the pdb commands for debugging python programs?

454


what is basic of networkin ?2.what is main topik of networkin ? 3.how installed the software and drivers ? 4. how to connect the pc and net?5.what uses of protocol in networking,and tell main proto of netwo

1944


How can you maintain information for an infotype?

578


How can I install Cloudera VM in my system?

656


Excel sheet having some datas and some datas present in the application (in table). How will you compare these two datas? Write code to fetch datas from Excel sheet.

1484


How many sql commands are there?

660


can we connect qtp 8.2 version with test director 8.0 verion if how if not why 2)when test director 8.0 version released

2527


What is data file in computer?

534


how do calibrate the valves.. with clear manual

1541