I WANT TO KNOW LONGFORM OF CT/PT USEDIN POWER PROJECTS OR
HT SWITCH YARD.

Answer Posted / minal

In power projects, CT stands for current transformer & PT
stands for potential transformer. These transformers are
used for metering purposes.
CT is connected after or before circuit breaker to measure
the current flowing through circuit breaker.
PT is used for measuring voltages of line also.

Is This Answer Correct ?    33 Yes 1 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

What Should be the value of Vector Surge angle at Tripping and how to calculate it?

1587


What is the formula to calculate the rating of a three phase air circuit breaker

1817


while doing high potential for 11KV 3 core cable how much leakage current will obtain?, what will be acceptance value?

2427


sir, i am 3 years diploma course pass out candidate.what type of certificate can i got in marine service.

1450


why do we carry out winding resistance test?

1840






Explain the propagation of harmonics in the network and influence of phase angle of harmonics.

1498


How isolater function when installed inelectrical 440V wiring

1704


How can I model an open-delta ground transformer for a network supplied by 4 unit GTG and power transformer in ETAP?

13290


how we calculate electrical load on a building according to area?

2261


when will be the iocl interview results i faced interview on 8th september 2008 iam from electrical branch i faced interview for the post of electrical engineer??????????????????????//

1584


What is systematic error?

818


What are the advantages of stationary armature and rotating field system?

704


How can we select suitable capacity generator for three phase load (inductive load) and how to take study analysis in 3 three phase load system ?

1668


How do I calculate a WTI CT ofa 1250kVA 6600/400V transformer

1307


what is the voltage rating of chiller unit sensors

2297