In power projects, CT stands for current transformer & PT
stands for potential transformer. These transformers are
used for metering purposes.
CT is connected after or before circuit breaker to measure
the current flowing through circuit breaker.
PT is used for measuring voltages of line also.
Is This Answer Correct ? | 33 Yes | 1 No |
Post New Answer View All Answers
What Should be the value of Vector Surge angle at Tripping and how to calculate it?
What is the formula to calculate the rating of a three phase air circuit breaker
while doing high potential for 11KV 3 core cable how much leakage current will obtain?, what will be acceptance value?
sir, i am 3 years diploma course pass out candidate.what type of certificate can i got in marine service.
why do we carry out winding resistance test?
Explain the propagation of harmonics in the network and influence of phase angle of harmonics.
How isolater function when installed inelectrical 440V wiring
How can I model an open-delta ground transformer for a network supplied by 4 unit GTG and power transformer in ETAP?
how we calculate electrical load on a building according to area?
when will be the iocl interview results i faced interview on 8th september 2008 iam from electrical branch i faced interview for the post of electrical engineer??????????????????????//
What is systematic error?
What are the advantages of stationary armature and rotating field system?
How can we select suitable capacity generator for three phase load (inductive load) and how to take study analysis in 3 three phase load system ?
How do I calculate a WTI CT ofa 1250kVA 6600/400V transformer
what is the voltage rating of chiller unit sensors