Answer Posted /

Is This Answer Correct ?    Yes No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

1) a)to prepare mortar for bricklaying how much amount of water should be added for its maximum strength and workability(to avoid cracks which results, when high quantity of water is added)?is their a formula or ratio? b) suppose we want to make 1:3 mortar,what is the best way to measure cement ,sand and water and how? c)time before which freshly prepared mortar should be used? d)proper way to mix and make mortar? e)when should curing start after laying bricks and for how long?and also how many hours per day? f)what is shear wall (please in terms of layman lol) bookish definisions are confusing.... g) and last,acc to codes what are max no. of course that should be laid in a day.

1676


What are the application of javascript?

477


What is spark table?

156


Are you familiar with the partner profile setup? I am sure when these EDI transactions must have been posted through SAP as idoc?

397


List some uses of dff (descriptive flex field) ?

513






i am preparing for motor vehicle assistant inespector please send me old questions papers.

1483


Which Services Are Provided By Window Azure Operating System?

323


What is the context switch?

559


How can it be found if an item is displayed on the screen?

524


What are the different types of metrics available in microstrategy?

531


Applications installed fine, also generated plugin, but application still not working, in this case which log to see?

534


400 ku d/c clearess ketan hota hai?

1552


Please explain do you know how to submit claims to a clearinghouse? Have you ever set up a provider with a clearinghouse or resolved claim submittal problemswith them? : insurance health

410


Where can i get the details about case laws?

1730


how to verify a button size (e.g Login Button) on a web page have same dimension prescribed by Client in UI Testing..??

1141