Un-Answered Questions { Civil Engineering }

according to the painting co efficient, we should take the one side of doors (or) windows or both sides?

1317


I want to know the material required per Square foot in rcc roof i.e.Steel ,Cement,

1523


Floor to floor high of domestic building is 3m design a quarter turn staircase starting assume taken give a suitable diagram of it?

1402


difference between fc and fc'?

1317


what is yield and tensile strength of steel, if steel has yeilding strength of 60 psi than how much its tensile strength?

1593


what is tension column?

1560


what is flexible and rigid footing?

1856


what is tension footing?

1543


show answer/ calculate-1-2-4 ratio-concrete -cement-sand- metal-water - please brief calculation

1697


how to calculate the crushing strength of cement concrete paver blocks 100x100x60 mm thich.

1506


115mm thickness brick work how to required mortar

1636


what is tension & compression of steel bending.

1840


What is the quantity of cement used for stone pitching work of 100sqm 225mm thick and cement mortar of 1:6? And how?

4662


in block masonry l=10',b=0.5',H=10',Calculate cement ,sand and no.Of blocks?

1569


for 16mm thick cement plastring 1:6 on 100 Sq.m.New brick work,the quantity of cement required is.

1523