Un-Answered Questions { SAP PM (Plant Maintenance) }

Which t code is used to do usage decision on inspection lot triggered by calibration order?

568


What is difference between single cycle plant and maintenance strategy plan?

755


How does actual cost of maintenance come on maintenance order?

511


Explain the refurbishment process?

652


What action will you take if inspection lot is not generated from calibration order? Which setting will you check?

593


Why completion confirmation is important for business?

502


Why do you need an equipment and functional location both?

638


What if maintenance failed refurbish a material, how will you handle such situation in sap?

474


What is the criteria to change the equipment category?

461


How pm module is integrated with ehs module?

668


Suppose there is a measuring point for temperature and while recording the values of temperature there is a deviation of values from given limits? Is it possible to throw a warning or error message? What is the configuration setting available?

471


What is the purpose of user status in notification? As a consultant what do you recommend to your client on the use of this facility?

560


What is item category?

486


Is it possible to trigger a notification from maintenance plan? How?

475


How breakdown maintenance and corrective maintenance are different from each other?

488