Un-Answered Questions { All }

how enter service bill in the tally and what is the process of service bill. aganst service charge @ 10.3%, sercharge 2% cess 1%

2099


Define the signaling massage in telecomincation

1637


what is Predecessor Company?

4658


what is cost centre , job costing & Budget control. what is the effect of these.Explain its briefly.

1624


Please if anybody have Vizag Steel Entrance exam papers or atleast Pattern of exam.Then please forward to my email- id: :srikanth.avanthi@gmail.com

1519


which are the basic princeples of accountancy... with examples

1718


The cost equation y= $0 + $1.60x represents which type of cost? Variable, Fixed, or Mixed

1723


1. Cold Ice, Inc. sells ice cream sells for $2 each. The variable costs per ice cream are $1 and the fixed overheard costs are $ 0.35. A summer camp wants to place a one-time order for 100 cone of ice cream at a price of $ 1.25 each. What is the minimum price hot dogs should be charge for this special order?

1450


Nike,Inc. has developed a variable-overhead rate of $10 per machine hour,and estimates fixed overhead $250,000 for production up to 100,000 units per year. If the production manager estimates 9,000 machine hours for the production of 90,000 units next year, what are estimated variable-overhead costs?

1800


How to select circuit breakers rating eg. if i select a circuit breakers of capacity 40 amps DC with operating voltage 28 volts and if i what to use same circuit breakers for 300 Volts DC application what is the current rating of this circuit breakers.

1315


how to replace not in with not exist?

3173


what is the defination of Cable database? What are the points are considered while preparing cable database? Is there any sample available for cable database?

1416


Hi to everyone...i had applied for f1 visa whcih was rejected twice adn at the third time the vo sadi that i had applied for visa in less tahn six mnths which is a voilation so try after six mnths..now if go for visa afer six mnths is thre a chnace of me getting a visa

2487


WE ARE PLACE A NEW 75 KW MOTOR FOR JPF.IT IS CONNECTED IN M.C.C. WHEN WE ARE STARTING M.C.C.INCOMER IS TRIPPED.THEN WE ARE CONNECTED IN P.C.C WITH A MM30 RELAY PROTECTION THEN WE ARE STARTED MOTOR WILL RUN SMOOTHLY.

1615


What is the pressure in co2 cartridge in a DCP 5 kg extinguisher.

2810