Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

Un-Answered Questions { All }

what is meaning of M30 concrete? if this is called compressive srenth of the 150mmx150mmx150mm concre cube at 28 days age then what is the concrete strength in psi?

1898


any one send me buildings dry material in m.k.s and f.p.s system on this id plz. mughalsab@ymail.com

1909


what is actual drum level and compensated drum level?

2241


I completed MCA and also I have OCA certification. Now I am working as a Application Developer in Asp.net but I need a job in Oracle Application or related to Sql or Pl/Sql.

2709


How can I Create a C program in splitting set of characters to specific subsets. Example: INPUT SET OF CHARACTERS: Therefore, my dear brothers and sisters, stand firm. Let nothing move you. Always give yourselves fully to the work of the Lord, because you know that your labor in the Lord is not in vain. SPLIT INTO HOW MANY CHARACTERS PER SUBSETS: 10 OUTPUT: Therefore, my dear b rothers an d sisters, stand fir m. Let not hing move you. Alway s give you rselves fu lly to the work of t he Lord, b ecause you know that your labo r in the L ord is not in vain.

2565


If I want to connect a capacitor bank on the HT side of a 11kV/415V, 3 phase delta-star distribution transformer to supply Reactive power to it..what practical specifications of a Capacitor bank that can i've??please reply..

2514


Why do you want to work here

2342


in one SQM plaster how much Cement and sand consumed in ratio 1:4

2254


Re: CST RATE IS 1 % IF C FORM IS RECEIVABLE. IF C FORM IS NOT RECEIVED FULL AMOUNT WHAT WILL BE THE RATE OF CST

1954


relation bet Coefficient consolidation Cv, time factor Tv, drainage path d, & time t is Cv=d2Tv/t Cv=d2t/Tv Cv=tTv/d2 Cv=Tv/td2

3014


in plate load test what is the thickness of plate 20mm 5mm 50mm none

2194


the distrubution system in water supplies is designed on the basis of avg daily demand peak hourly demand coincident of draft greater of B & C

2072


Bernaullis theorem deals with the law of conservation of mass momentum energy none

2035


primary treatment of sewagw consist of removal of floating materials removal of sand & grit removal of organic materials all above

2252


in levelling operation the first site on any change point is back site the second site on any change point is fore site the line commenses with fore sight & closes with backsight the line comensses with back sight & closes with fore sigh

2281