i was rejected visa that i am vacant for 18 months .Can u suggest me what type of answer should i has to ive for this question.
questions with answers to face an interview of an civil engineer regarding RCC buidings
what is the procedure involved in preparing mix design of m15 grade as per IS-10262-1982
Hi All, My names is Raj. I've applied for my MBA in Business Administration for Jan Intake 2011. I have completed my computer science engineering in the year 2006 and worked for companies like monster.com(3yrs) & Dimdim software(9months) starting 2007 as business development executive. Will this effect any doubts to VO's or will my experience matters them alot as worked for top notch companies and if questioned by them, can you help me what kind of answers do they question me on this grounds. Thank You....Also plz mail me on rajendra.goli@yahoo.com
what happen if generator of micro hydro running at only a small percentage of its capacity, as a comparison, if the diesel generator that runs on only a fraction of its capacity there will be a wet stacking
How can call any javascript function without saying onclick, onchange, onblur etc events in php?
What is highest size of HT motor like 11 kv or 33 kv,and how to make it 750 rpm.i think the size will be very big.any idea ? pl. reply..
How can you relate the function with the structure? Explain with an appropriate example.
Is it required to lay 2 runs of GI wires along with armoured cables from one power DB to another Power DB?
Is it required to lay GI wires along with GI/MS conduits from one point to another point though separate earthing cable is conncted from DB to Socket?
Is it required to lay 2 runs of GI wires along with armoured cables from one power DB Machines of higher rating?
Is it required to do earthing in 2nd shop if earthed armoured cable is laid from 1st shop ?
What will be advantage if we put some load in neutral of grounded star transformer & loadshortcircuit current,rated current of cable & MCB with example?
What is the difference between shortcircuit current, rated current of cable & MCB with example? What will be the size of cable required for 5.5 KW motor (Full load current 10 Amps approx.), Starting current with DOL is 120 Amps. Aprrox. Short circuit current with LLLG fault is 2000 Amps Approx.
Where can I get CPWD electrical specifications & Shedule of rates? Please help me