a gas turbine have how many thermocouples?

DEWA,

2 4332

why airtel use + 24 volts and other operators use -48 volt

ABC, Airtel, INDUS, Reliance,

2106

1.what is the reason for transformer and lightning arrester blast in 33kv system

Afghan Telecom, Integra, Sanghi,

1 6309

In turbine. why they not use 320 oil?

1 5416

what is the difference between flow and force ,draught and vaccum ,tube and pipe?

3 7281

Looking for Bently Nevada surplus 3300/52-01-00-00 Reverse Rotation Monitor , 4 pieces.

OPG,

2975

what are all the pre commissioning activities in WTP in power plant

1 6801

What happen when the AVR of the generator fails? Will it cause power instability and total failure of the alternator?

8 35843

What is Droop Control in Woodward?

3 8926

What is difference between Actual Drum Level and Compensated Drum Level?

DVC,

2 8181

Boiler capacity is 5ton, what will be the feed water tank capacity?

dscl, Indiabulls, Krest, TCS,

11 16784

We have 132KV/11KV Grid connected power transformer for getting power from Grid. Can we use this transformer for sending generated power as well. I mean step up from 11KV to 132KV and transmit.

6 11469

why HT motor star not grounded?

Apollo,

4 8316

why drum level falls when one of the running coal elevations tripped?

APGenco,

3 6180

what is significance of canister vent in condensate extraction pump & difference between vacuume balancinf line & canister vent

NTPC, Tata Power,

3 21054


Post New Power Plant Engineering Questions

Un-Answered Questions { Power Plant Engineering }

Which will have more strain energy 1.Spring 2.Circular disc 3.Solid square plate.

1880


Qatar Fertiliser Company (QAFCO) Shortlisted me for interview (got the intel from my source) for Field Operator- Utilities post. Please let me know what kind of questions they asked? ... this position requires 5 years of experience in Power Plant and background Diploma in Electrical/ Mech. ... my Background is Electrical and I am a sub Assistant Engineer (Operation) at a private HFO based Power plant... PS: Please Let me know what preparation should I take to obtain the Interview which will be take place In Bangladesh soon

1765


what is the trip circuit supervision in an electrical meaning?

1439


can dp type level transmitter work in under vaccum condition

1531


Why superheated are started before I'd and rd fan?

1692






what is the basic use of power plant in equipment

1225


How do you consider that you can improve and what assistance do you need to achieve this

1332


explain how the third harmonic content of the magnetising current affects transformer design

2770


By any way can we increase the B check hours from 300 to 500

1694


how to differentiate between "ALL fuel lost" and "All Fuel Lost" in Boiler MFT condition?

1227


why airtel use + 24 volts and other operators use -48 volt

2106


what's the moog valve

1050


im try to calculating seawater flow required for SW-FGD system. I need a guide, equation or method to do it, can some one help me! Thanks very much

1473


procedure of how to generate power in solar plant.

1374


How to calculate boiler capacity? I have 1 Autoclave, Which has to use for AAC block. Dimension for this Autoclave is - 13 Meter Length & 2.2 Meter Diameter.

1822