how to calculate magnetic force genrated by a coil ?
Are you aware of containment and Aggregation ?
What is raito of coolent level in DG
1 01 101 01010
What is manual sharing?
A commercial Building is designed with 14th floor levels with indoor substation of three phase transformer with rated capacity of 1000 Kva.The transformer delivered 65% of its rated capacity at 0.67 power factor lagging.Because of low power factor, the power customer was penalized and certain cost was charged accordingly based on every point percentage lower than 85%.This situation may repeatedly happen on the succeding energy bills of power customer.The power customer is desired to improve its historical power factor of 0.67 lagging and no further penalty be impose by the local power company on the next bill. Q: Identify the appropriate solution you want to offer to Client?.Justify SCIENTIFICALLY and MATHEMATICALLY the principles behind the solution.
what are the works of qualist analyst in bpo
what is the function of TRU and how it works and how many calls it will take at a time?
please give me the rates of RCC(CUM), PCC(CUM), Brick Work(CUM), Tile Flooring, Saria Shuttering
Which are the elements of hibernate architecture?
what is parallel query?
Why is threading bad for you?
How to define ip address?
Is spark distributed computing?
What are derived properties in hibernate?