Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

Company Name Starts with ...
#  A  B  C  D  E   F  G  H  I  J   K  L  M  N  O   P  Q  R  S  T   U  V  W  X  Y  Z

Afghan Telecom Electrical Engineering Interview Questions
Questions Answers Views Company eMail

What types of CMOS memories have you designed? What were their size? Speed? Configuration Process technology?

3702

Post New Afghan Telecom Electrical Engineering Interview Questions


Afghan Telecom Electrical Engineering Interview Questions


Un-Answered Questions

What exactly does Salesforce do?

510


How to use exit command in dos?

539


What is most used email form script?

886


A PLC is programmed to drive three motors A, B and C as follows : After running motor A for an hour, motor B should get ON and motor A should get OFF. And after running motor B for an hour, motor C should get ON and motor B should get OFF. And after running motor C for an hour, motor A should get ON and motor C should get OFF. (That is, a cyclic repetition with time period one hour) Now, the second condition is: If any motor gone faulty and is tripped, the consecutive motor should get ON and the faulty (tripped) motor should be eliminated from cyclic repetition. The remaining two motors should bear the cyclic repetition of one hour each. (For healthy motor take logic as high and for tripped motor take logic as low) Now, the third condition is: When motor A load(Amps) exceeds 60% of its rated load, motor B should get ON in parallel to motor A. And when both motors A & B are running in parallel, and if their load exceeds 60% of their rated load, motor C should also start in parallel to A & B. [Here the cyclic repetition is eliminated, until their loads become normal(40%)] [Take logic high(1) for load at 60% and logic low(0) for load at 40%] Now draw a flow chart or a ladder diagram to fulfill the above condition.

2179


Can you define an argument as a reference type?

971


What is character constants?

1194


What are the steps involved to run php?

1075


How to measure velocity if our iteration lengths change?

5


Purchase and sales sahres accounting entry which have stt brokerage and other taxes

4039


What are base tables of an aggregate object? : abap data dictionary

1087


Name some Primitive types of Data types, Avro Supports?

59


explain the difference between html and html5

1300


Why do we need array in java?

1031


What are module loaders in angular?

848


Define slowly changing dimensions (SCD)?

1063