Example of dojo script using widgets?
In our factory so many iron pillors are exists for supporting the shed/Hangar. If do more no of earthings at one piller instead of doing more earth pits in many locations and running earth strip around the hanger, I can save the money. Please suggest this method is acceptable as per Is specifications though the Earth resitance of the farthest piller is with in the limits as per IS specifications.
Can the data stored in a block modified once it is written? If so, why?
How do you use lookup function in excel 2016?
what is total power generation capacity in india at present (as on 12-12-2011)
Explain different types of action in qtp?
What is CaseComplete Files?
What's the difference between x86 and x64?
What to do if getting missing or corrupted file messages?
How do I post a blog on wordpress?
Corenuts technology interview questions
Explain a good test engineer?
How would you deploy your old applications with .net framework 4.0? Are the old applications compatible?
In which year was the meteorology department founded?
What is blocking?