I post Optional Voucher in Tally.ERP in which there is deduction of TDS is applied. But when I convert this voucher as regular voucher the TDS entry have to make again why so
2090Post New Vita Interview Questions
How fast can a shadow move ? If a moth fly's in front of a very bright room temperature light powerful enough to light up Saturn like the sun could it's shadow move faster then light if there was no light diffusion.
What are the four objects in a database?
Explain how you can capture the script of the authentication window in jmeter?
The Tabula Manufacturing Company has been in business for one month. At the end of month the company had the following accounts: Materials used K 5 000.00 Direct labour 10 000.00 Indirect labour 3 000.00 Indirect materials 2 000.00 Labour fringe benefits 1 000.00 Supervisor’s salary 1 000.00 Depreciation Machinery 2 000.00 Miscellaneous factory overhead 1 000.00 Heat and light 500.00 Insurance on plant 1 500.00 The company processed two jobs during the month with costs as follows: Job 101 Job 102 Materials cost K3 000.00 K2 000.00 Direct labour cost K6 000.00 K4 000.00 Direct labour hours 4 000.00 3 000.00 Machine hours 2 000.00 1 000.00 The company does not use a predetermined rate for factory overhead. The rate is computed at the end of each month. Required Use both the direct labour hours and machine hours to compute: 1) The overhead rates for the month (5 pts) 2) The overhead cost for each job (5pts) 3) The total cost for each job (10 pts) 4) Briefly describe the difference between Job order and process costing, citing relevant examples (5 pts).
How do I get a bitmap picture in a field in an Access database?
What is Predictive analysis process in R?
Can a bad cpu cause blue screen?
What is java spring boot used for? : Spring Boot
What is the base class of all exception classes?
Differentiate between contract and scheduling agreement
what is the diffrence between cash flow & cash fund?
How do I create a summary report in excel?
What is meant by cascading effect?
What do you mean by an execution plan? Why is it used?
What is the procedure for installing USP-35 on my compure?