How do you feel u contributed to its effectiveness?
What is merge in oracle?
How do I register a dll in windows 10?
I need to learn everything I can about Function, Non-Functional and Regression Testing. What is the best online resource?
Explain how can you tell whether a program was compiled using c versus c++?
What does td colspan 2 mean?
What is php used for?
how i convert mm into standard wire guage (SWG)no.
How many commands are there in sql?
What are the machine learning algorithms supports in apache mahout?
What is the main difference between ‘between’ and ‘in’ condition operators?
How to do stting of vl250 siemens MCCB
Explain process id.
Why is quicksort so fast?
It is desired to flood light the front of a building 42 meters wide and 16 meters hig.Projectors of 30 degree beam spread and 1000 watt lamps giving 20 lumen/watt are availabl.If the desired level of illumination is 75 lumen/m and show a suitable scheme.Assume the cofficient of utilization, deprecitation factor and waste light factor are 0.4, 13 and 1.2 respectively.