If a background job runs more than the time it should be
completed normally then what action will u take ?
Plz Post the Answer
Answer Posted / ravi m
1. Check the system (if u have any dedicated application
server for background jobs check the particular application
server Status and response time and os logs) response time.
2. If there is no enough background process to execute that
background job increases the background process if u have
enough background process then check the network speed and
network response
| Is This Answer Correct ? | 3 Yes | 2 No |
Post New Answer View All Answers
What is the different architecture between SAP 4.7EE & ECC5.0
How do you create an instance?
What is business kpis ?
What is the procedure to applying patches?
What settings we have to do in EEWC while using slandalone SAP-CRM system.
does the Tcode EWZ5 exist in ECC6?I'm using NW2004S SR2 abap engine and EWZ5 doesn't exist in that.so in that case what is the alternative to EWZ5?to see the list of users present in a client but not necessarily logged in and to to lock or unlock them? Thanks.
what is role of sap administrator in pi & ep?
you want to take sap backup using brtools. How would you do that?
What is a support package?
How to perform a sap-export and import tables in sap from os level?
what is the use of tcode SUSHARE in SAP and how the mass user authorizations compared?
What will you do if u got Update failure?
How to analysis abap dumps?
In a situation where my sap system is down (users unable to login to sap system), how to analyze the problem?
I want to let sap skip printing cover pages during printing for any kind of report. How can this be done?