please send the marketing aptitude,computer knowldege for
sbi clerical exam ........
my e-mail id is sneha_o09@yahoo.com
Answer Posted / guest
please send the marketing aptitude,computer knowldege for
sbi clerical exam for the post of Clerk.
my e-mail id is sanjyoti14@yahoo.com.
| Is This Answer Correct ? | 10 Yes | 6 No |
Post New Answer View All Answers
There are 19 red balls and one black ball . Ten balls are put in one jar and the remaining 10 are put in another jar. what is the possibility that the black is in the right jar.
There is a safe with a 5 digit number as the key. The 4th digit is 4 greater than second digit, while 3rd digit is 3 less than 2nd digit. The 1st digit is thrice the last digit. There are 3 pairs whose sum is 11. Find the number.
f(X)= 2X-1 + f(X-1) if X is not equal to zeroandiff(X=0)=0, If f(f(X))=81 then the value of X=?
A man collects cigarette stubs and makes one full cigarette with every 8 stubs.If he gets 64 stubs how many full cigarettes can he smoke.
with 4/5 full tank vehicle travels 12 miles, with 1/3 full tank how much distance travels
A car is filled with four and half gallons of oil for full round trip. Fuel is taken 1/4 gallons mor3 in going than coming. What is the fuel consumed in coming up?
Find the correct meaning of the following phrase: To be in the air
A boy has Rs 2. He wins or loses Re 1 at a time If he wins he gets Re 1 and if he loses the game he loses Re 1. He can loose only 5 times. He is out of the game if he earns Rs 5. Find the number of ways in which this is possible?
What would be the rank of the word LABOUR in the dictionary if all the possible permutations of the alphabets of LABOUR are done?
36:4 :: 9: ?
inept : clever :: languid :
What is the total distance covered by Sachin if he covers 2/3 rd of the distance at 4 kmph and the remaining distance at 5 kmph in 1hr 24min?
Write a C Program to declare an array for 2 0 floats. Accept the values from the user sort the two arrays in descending order. Merge the two arrays into a new array and display the new array.
A can do a piece of work in 20 days, which B can do in 12 days. In 9 days B does ¾ of the work. How many days will A take to finish the remaining work?
If VXUPLVH is written as SURMISE, what is SHDVD?