Answer Posted / amrita
pile foundation is a type of deep foundation which is
prefered in case of encounter of upper soil strata of lower
bearing capacity.In order to transfer the loads of the
superstructure to a strata of high bearing capacity deep
below the ground such as rock strata pile foundation is
used.
| Is This Answer Correct ? | 209 Yes | 35 No |
Post New Answer View All Answers
In the present situation of ban on mining sand from rivers,can we go for formation of earth dam filters viz;Horizantal sand blanket,inclined chimney and filters under rivetment with crushed rock sand of 6mm down size.If so what are the specifications and is there any codal provision for its authentication?
How much quantity water should be placed in one cubic meter area?
What is the difference between 53 grade and 43 grade cement
1.what type of the rock is most suitable for wet mix macadam in construction of road? 2.what is the highest maximum dry density and optimum moisture content can be acheive by using most suitable crush rock?
cement mortor 1:5 for 30 m2 12 mm tk plastering so how to calcualte its rate
Currently my house construction is going on but we just realized that the portico earth beam couldn't connect with the original earth because the beam rod not extended so Please advice
asubmerged weir is one in which the water level on the down stream side of the weir is just at the crest level below the crest level above the crest level at stamp elevation as water surface on upstream
What is the crank length in the slab?
What type of tensile strength is handling by crank in beam? Thanks.
IS STEEL BARS IS AS PER ISI TRANSVERSE RIBS SHOULD BE UNIFORM IN DISTANCE, PLEASE EXPLAIN WHY,
In foundation design, while we do the base pressure check, we normally check if the attained pressure value is less than the GROSS BEARING CAPACITY of the soil which is the sum of net bearing capacity of soil and the overburden pressure. Actually, the overburden pressure acts against the net bearing capacity of the soil and I feel that we are actually increasing the bearing capacity value and doing the check. I feel that this is NOT right. Please clarify on this.
how many time use of plywood shuttering and IS code
How to calculate 1 brss for RCC work
a sewer which receives the discharge of no. of house sewer is called house sewer lateral sewer intrcepting sewer sub-main sewer
What is the FE 250 structural steel of 8mm tk plate testing sample intervals with IS code or international code?