What is "V-n-V" Model ? Why is it called as "V"& why
not "U" ? Also tell at what Stage Testing should be best to
stared?
Answer Posted / sushmaa....from kurnool
V model difines multipul stages of development along with
testing stages. in V.Model "V" stands for "verification and
Validation" thats wat we r calling "V" model
Is This Answer Correct ? | 3 Yes | 2 No |
Post New Answer View All Answers
HI can i know who is taking real time testing classes in banglore? i am preparing to put 3+year experience in testing if possible anybody give suggestions for preparing 3+exp
1) Difference between "Delete" and "Concatenate" with reference to databases? 2) Difference between SDLC and STLC. 3) Latest versions of the browsers used. 4) What is URL Tampering? 5) Full form of URL. I don't need the answers. These are just for reference.
Hi to all, im vaibhav i joined a MNC as a tester and i got a banking (HSBC) project can any one tell me as a fresher what kind of strategy i sholud use to perform better. thanx
1.For a single module how many builds are possible 2.what will be the max or min time to finish up an single module
what is acid testing?
What is Test Design?
What are the properties of a good requirement?
What are the phases involved in software testing life cycle?
How to write test case for view the table(i.e it is already stored in database and see the content in the table)
Test cases for Internal IP Messenger
What is the difference between code walkthrough and code review? What is the difference between walkthrough and inspection?
What are the cases why parameterization is necessary when load testing the Web server and the database server?
What is smoke testing and what is sanity?
You must test a trouble report where the problem cannot be reproduced. You tried using various test data files and mutations from the data files the customer sent along with the trouble report. The software does not fail the way it did at the customer's site.
1.Acceptance testing involves procedures for identifying acceptance criteria for interim life cycle products and for accepting them.is that? 2.Acceptance testing occurs only at the end point of the development process; it should be an ongoing activity that test both interim and final products.is it?