What r different reduction startergies in SAP PP?
Answer Posted / animesh kumar
please narrate whether you are taking about redction
strategies of LEad time in scheduling or redction on PIR
Is This Answer Correct ? | 7 Yes | 0 No |
Post New Answer View All Answers
What is plm (product lifecycle management) in sap pp and what is the use?
what do you mean by planning time fence
What is the planning time fence?
What is a ‘routing’ in pp?
How do you restrict the data to be entered in the payroll area?
Overlapping and splitting, where do you assign?
What is the use of mrp group?
How can I use variable size items?
Difference between byproduct and co-product.
Explain about rough cut planning
How is the processing time calculated in a wc when both labor, machine categories exist?
Integration between PP and QM Module.
What is pi sheet
What do you mean by pooled capacity?
Can't one material be assigned to more than one operation in a routing?