why is the vector group analysis done in transformer tests
Answer Posted / dinesh kumar
1,Vector group is done on transformer High voltage winding
with respect low voltage winding.
2,To find the phase angle/difference between different
connections in high voltage windings.
3,In three phase winding transformer there are 36 vector
groups.(1u1v1w 2u2v2w)
| Is This Answer Correct ? | 54 Yes | 39 No |
Post New Answer View All Answers
how to avoid electrical shock how capacitor store charges wat are the speed control of induction motors state faradays law flemings left hand rule what is rotary converter wat is transmission and distribution what are the sources of energy abrevation of acb,vcb,sf6,igbt what is output equation of transformer which test copper iron and iron loss are calculated what is eddy current draw a single line diagram (10 marks) draw direct online starter(10 marks)
What is acsr cable and where we use it?
y we use neutral,all r told its used to for closed path..k its a just used to closed path,in a transmission line y we put same conductor used n both phase and neutral..if we use less than phase conductor in neutral mean we ll reduce cost its right r wrong..if we use mean any problem occur in transmission line..
The synchronous machine excitation system explain
when the Transmission and Distribution network where is the "feeder" lines are located? and why should be used in T&D network.....
tell me some type of questions throught which i can prepare for exam and do my best
How to calculate the copper in HT motors if KW, RPM & Voltage is given
what is R Core Transformer. how it differs from normal transformers. dont search in net and post the answer.
What’s electric traction?
I want to put this query to SENIOR & EXPERIENCED ELECTRICAL ENGINEERS. 1)I want to know about the control circuit diagrams for control panels. I found it difficult to understand. Is there ant booklet through which we can learn the circuit diagrams? 2)I want to learn about conduiting, laying cables, preparing cable schedules and various techniques which is the part of building infrastucture(construction field). I don't have any experience in this area. I have experience in control panels only. that's why i am not getting any opening in building infrastucture (construction field).Can I get the job in this field as Trainee Engineer? How to enter this field? I need job in PUNE
why wire sizes are 3/29 or 7/29 and why not wire sizes are 2/29 or 6/29?
What is the equivalent circuit of a transformer and its vector diagram?
How Can I calculate for the photometrics requirements for a street lighting? Data given are: 45 units of 6 meter light pole with 150 watts metal halide lamp, 220 volts and installed in a promenade area.
How maesure earth neutral value & how much maximum value value required in between earth & neutral.
What is the difference between electronic regulator and ordinary rheostat regulator for fans?